AI for planning in the physical world

Explore the possibilities. Understand what follows.

We’re developing an AI workspace for engineering and production teams to compare plans, trace their consequences, and work through changes together.

Follow a part change

A part rarely changes alone.

Your team is considering a new material for a housing already in production. That change can affect assemblies, qualification, stock, work instructions, and scheduled builds.

Part 30014 is approved at revision C. Can proposed revision D enter Build 2412, the next scheduled build?

An articulated measuring arm inspecting a machined housing
Dimensional inspection of a machined housing

The system beneath the question.

Engineering, production, and quality each hold part of the answer. Stone Current connects records from your systems in a working model, preserving their sources and checking access as you investigate.

Exploded technical cutaway showing one ribbed housing across separate engineering, production, and quality source planes beneath a shared working view.
STONE CURRENT · ECO-1047Working viewPeople and agents investigate
ACCESS CHECKEDTraceable to each source
PLMPart 30014Revision C approved
ERPItem 3001442 units in work
QUALITYQualificationCompletion unconfirmed
Related PLM, ERP, and quality records retain their source identity.

Trace the impact of a change.

Follow ECO-1047 from the housing to the assemblies that use it, then to the builds and checks it could affect. A selected relationship shows the evidence behind it.

SCStone Current/Workspace/ECO-1047
Connected sourcesJM
Change impact graphPart 30014 · Revision C → proposed D
Source recordsFollow path⌕
Path under investigation · Can revision D enter Build 2412?
CHANGESOURCE RECORDSDEPENDENCIESBUILD & QUALITYECO-1047Material changeRevision CApproved · PLMPart 30014Housing · PLMItem 30014Inventory · ERPMaterial M-7ProposedPump moduleAssembly · PLMDrive assemblyAssembly · PLMService documentDocument · PLMWork instructionDocument · PLMSupplier orderOpen · ERPBuild 2411Current configurationBuild 2412Next build · inspectBuild 2413Candidate cutover42 units in workERP · observed 14:32QualificationTiming unconfirmedECO-1047Part 30014Pump moduleDrive assemblyBuild 2412ERP item42 units WIPQualification
One part, several consequences.

The selected route reaches Build 2412 through two assemblies. The full graph also includes ERP work in progress, documents, and an open qualification check.

Selected path Source observation Open check

Example · ECO-1047, a proposed housing material change, traced to Build 2412.

An investigation is shared work.

Bring engineering, production, and quality into the same investigation. On a shared page, your team and an agent can add findings, revise conclusions, and assign the next checks.

ECO-1047 / SHARED PAGE

One document.
Several contributors.

The agent flags 42 units already in work. Jamie asks it to investigate a later cutover, while Alex checks the qualification schedule.

JMAL✳Working in the page
Change reviews › Housing material changeEdited just now   ◌   ↗
⋮⋮⋮⋮⋮⋮
What happens to work in progress?

Part 30014 is used in the pump module and drive assembly. We need to check which builds overlap the material change.

✳Stone Current agent addedSource-backed block

ERP work orders show 42 units in work for Item 30014. Before a cutover at Build 2412, confirm how these units and remaining stock will be handled.

◇   ERP · Work orders for Item 30014 Observed 14:32
Jamie is editing

Let’s examine a later build cutover before changing the work already in progress.

□ Confirm qualification date before approving cutover Alex
AL
Alex

I’ll confirm the qualification date. Build 2413 is still a candidate.

Reply

Explore more than one future.

Investigate an early cutover, a later build, or keeping revision C. Your team and its agents can work through each option from the same starting evidence, with separate assumptions and findings.

Source evidencePLM · ERP · Quality
ECO-1047Stone CurrentBranch and compare
Early cutoverBuild 2412 · Qualification open
Later buildCandidate Build 2413 · Qualification open
Hold revision CCurrent configuration
Early cutover at Build 2412, a candidate later cutover at Build 2413, or hold revision C. Both cutover options still require qualification.

Build an app around the decision.

Turn a useful investigation into an app your team can use again. Work with an agent to compare build boundaries, inspect supporting records, and track open checks as the plan develops.

SCStone Current/Apps/Housing change impact
Scenario analysisJM
▦
IMPACT EXPLORERHousing change impact
Part 30014 ⌄Rev C → proposed D ⌄View recipe ↗
SELECTED SCENARIO

Later build cutover

Propose revision D from Build 2413, subject to qualification and cutover approval. Keep current work on C.

Open check · qualification
Scenario build effectivityCurrent Proposed
2411
2412
2413
2414
Revision C
Revision D
D prerequisite
Qualification timing unconfirmed · required before cutover

Build 2413 is a planning assumption. Qualification timing and stock disposition remain open.

What changes downstreamSelected scenario · proposed actions
DependencyConsequenceEvidence
Pump moduleAssembly · PLMReview BOM effectivityPLM where-used ↗
Drive assemblyAssembly · PLMReview BOM configurationPLM where-used ↗
42 units in workWork in progress · ERPRemain on current materialERP work orders ↗
Inspection planQuality · documentReview acceptance criteriaOpen check ↗

Example · Compare where a revision would enter production—its effectivity—with evidence and open checks in view.

A decision deserves a clear handoff.

In the later-build example, carry the scenario into a proposed change with its evidence and open checks attached. Your team can review what would change in the source systems before submitting it.

FROM THE INVESTIGATIONECO-1047 ↗
Later-build pathLater build
cutover

Keep current work on revision C. Propose D from Build 2413, subject to qualification and approval.

Evidence carried forward

42 units in workERP · observed 14:32

2 affected assembliesPLM · observed 14:30

Qualification timingOpen · must be resolved

Scenario branch · evidence attached
PREPARED CHANGE · ECO-1047Awaiting review
PROPOSED / NOT SUBMITTED

Introduce housing
revision D

Build 2413 is the candidate cutover. Qualification, effectivity approval, and stock disposition remain open.

PLM
Part 30014

Revision C → proposed D

Recheck revision and state
ERP
Item 30014

Prepare material transition

Review stock disposition
REVIEW BEFORE SUBMISSIONA person reviews the edits. Submission rechecks permission and target state.
Pending

Example · Proposed changes to PLM and ERP records, awaiting review and resolution of open checks.

Stone Current

Make the next move with a clearer picture.

A housing change is one example. Stone Current is being built for the decisions that connect engineering and production—from supplier substitutions to quality holds and build transitions.